Sustainability

Whether we repair or replace equipment, there is always the opportunity to improve the efficiency of the system. Whether we install a more efficient IE3 electric motor, or look for ways to minimise downtime, we have loads of guides to help you make more informed decisions.

Displaying 20 of 22 results
CAFA Carbon Neutral.png

AEMT CAFA Carbon Neutral Association Certificate 2023

301-file-3.svg

AEMT Environmental Policy

Minimising Downtime Guide Cover Image

AEMT Minimising Downtime Guide

Subscription Required.

BS 8001 2017

Subscription Required.

BS EN ISO 14064-1:2019

carbon emissions reporting.png

Carbon Emissions Reporting

eyoel-kahssay-plant-tree-unsplash.jpg

Carbon Offset Emissions

Subscription Required.
Houghton International Turbine Repair

Emissions Case Study: Houghton International

ecologi logo.png

Measure Carbon Emissions - Ecologi Zero

Page 5 1.jpeg

SKF Appoints ERIKS as Its First UK Maintenance Partner

See more
×

Codes of Practice 2025

IMPORTANT:

The AEMT Codes of Pracice are being replaced with our provisional codes of practice at the end of 2025. Members will be asked to demonstrate compliance with these codes by 2027. The Secretariat and Council are preparing for this transition, ensuring members have the support, resources and tools needed to comply.

Find out more